How a Major Nuclear Plant Saved Millions of Dollars by Cutting Pump Overhauls
Greene Tweed’s AR-HT PEEK bearings improve corrosion resistance and reliability for prolonged use end user specifications.
Sponsored by: Greene Tweed

A major nuclear plant site struggled with several operational challenges involving its service water pumps. They saw remarkable improvements after upgrading to Greene Tweed’s AR-HT bearings:

  • Elimination of at least five pump everhauls, saving over $1.5 million in maintenance costs and preventing potential operational disruptions
  • 3% efficiency Increase, with the HyroAire’s pump curve now aligning closely with the hypothetical curve

By addressing both performance and material resilience, the pumps now operate robustly, aligning with the plant's rigorous operational standards and ensuring sustainable, cost-effective performance.

Fill out the form on this page to download this case study.

 

This case study is provided by both Pumps & Systems and the sponsor who may follow up with you regarding their products and/or services. Please complete the form below to download this case study.

Who will control my data?
Cahaba Media Group and the sponsor will control your data.

What data are we collecting?
This form collects your name, your company name, your email address, your job title, your country, your state, and your IP (computer) address.

How will we use this information?
The information you provide may be shared with the Pumps & Systems partner sponsoring this content, so that they can follow-up with additional information regarding their products and services. For more information, please visit our Privacy Policy.