Designing explosion-proof equipment for wastewater treatment.
shredder pumps
Foreign materials in sewage system led the maintenance team to look for a new equipment option.
How one company fixed constant pump failures.
The facility's long-term relationship with pump manufacturer results in custom solutions to address idiosyncratic industry challenges.
Denver’s Coors Field replaced old chopper pumps in its underground vault to better manage runoff, potential flooding and the 200,000 gallons used for cleaning.
After the hangar’s chopper pump in the wastewater sump failed, the maintenance team looked for a reliable, long-term solution.
The Pomona Valley Hospital Medical Center was spending between $4,500 and $8,500 per incident to remove solids from its sewage ejection pits.
New shredder pump technology can prevent costly clogging and minimize damage to equipment and municipal reclamation facilities.
The facility replaced old grinder pumps with stainless steel shredder pumps, which have needed no maintenance in almost two years.